P.B.W., Yesi Nidya. Analisis Keterlambatan Waktu pada Proyek Pembangunan Gedung Kantor Kelurahan Gedog Kota Blitar Dengan Metode Network CPM (Critical Path Method). Journal of Science Nusantara, [S. l.], v. 2, n. 3, p. 130–142, 2022. DOI: 10.28926/jsnu.v2i3.526. Disponível em: https://ojs.unublitar.ac.id/index.php/JSNU/article/view/526. Acesso em: 16 aug. 2026.